Getting Started
This tutorial helps new teams launch Light Lane with minimal risk: define one test workflow, calibrate settings, and capture the first approved template for repeat use.
Last reviewed February 15, 2026
Find setup, calibration, controller, workflow, troubleshooting, and licensing answers quickly.
Type to search all docs.
First-week rollout steps
Keep scope narrow for faster validation.
- Step 1
Choose one controller and one common material.
Avoid multi-variable rollouts initially.
- Step 2
Import one real job and run preview.
Confirm travel and operation mapping before firing.
- Step 3
Run a small material test grid.
Capture a safe baseline settings window.
- Step 4
Save approved settings as a template.
Use the same baseline across operators.
Checklist
Use this checklist before your first production run.
- Preview reviewed by operator.
- Focus and material assumptions documented.
- Baseline settings validated.
- Template saved with notes.
Next recommended article
Still stuck?
Use support for direct help, or start a trial and test this workflow with your own file and machine setup.